Welcome to visite Brothersports website:We supply Plastic runway particles,EPDM granules,TPE granules.
Language: ChineselineEnglish

FAQ

The construction method of the school ventilation type rubber runway?

1, breathable particles of plastic runway
Check the basic flatness, with 3M straightedge measurement level needed in less than 3mm, the whole overall smooth, site drainage slope meet the requirements. The particle size of 3-4mm high elastic black particles doped high strength single component glue, stirring evenly into the paver and paving thickness is 10mm, cured 24 hours of maintenance. With permeable surface layer materials doped with equivalent particle diameter 1-2mmEPDM particles and the amount of diluent mixing evenly, into the spraying machine, a spray gun to 60 degrees tilt of with to spraying, to be sprayed after 24 hours of maintenance, on the contrary direction are a spray, maintenance 48 hours before use. All weather use, environmental protection, no pollution, no fading, no particles, water permeability, air permeability, the use of mechanical construction, excellent flatness. On the basis of reinforced concrete pavement is the best.
2, mixed type particle plastic runway
The cement based waterproofing or asphalt based back treatment. Be the basis of the layer disposed maintenance 24 hours can be paved runway bottom, the end of the runway material according to GB containing 25% particle size 3-4mm high elastic black particles, stirring evenly into the site, raking strickle, laying thickness 9mm, curing and maintenance 24 hours. The audience into 2mm thick runway surface layer material, shave a rake strickle, full uniform spread under 3-5mmEPDM anti-skid particles, 24 hours after cleaning off unstuck EPDM particles, after roller coating or spraying a layer of special track topcoat.
Super nail resistance, suitable for a variety of venues, easy to maintain, the economy, can absorb the strong impact, aging resistance, bright colors. On the basis of asphalt pavement zui.
3, composite particle plastic runway
Check the basic flatness, smoothness measurement ruler with 3M within 3mm, the overall smooth. The particle size of 3-4mm high elastic black particles doped high strength single component glue, stirring evenly into the paver and paving thickness 9mm, cured 24 hours of maintenance. Black particles and the bottom cover with PU glue is mixed 30% black powder or talcum powder, back cover 24 hours of maintenance, the audience into 2mm thick runway surface layer material, shave a rake strickle, full uniform spread under 3-5mmEPDM anti-skid particles, 24 hours after cleaning off unstuck EPDM particles, after roller coating or spraying a layer of special track topcoat. Anti UV, effectively avoid sports injury, with tough elastic layer and buffer layer, anti wear cleats, moderate hardness, wear resistance. On the basis of reinforced concrete pavement Zui better.
4, printing type non slip plastic runway
The cement based waterproofing or asphalt based back treatment. Until basal layer disposed of maintenance 24 hours immediately after paving the track bottom and bottom plastic material according to GB containing 25% particle size 3-4mm high elastic black particles, stirring evenly into the site, shave a rake strickle, laying thickness of 10mm, curing and maintenance of 24 hours. The whole audience into the 2.5mm thick printed runway surface layer materials, scraping scraping flat, with the stamp on the cover material, 24 hours after the printing of a mold, that is, visible 2-3mm thick printing surface layer.
Special pattern design, wear-resistant, non slip, integral forming surface layer, the thickness is uniform, do not drop the particles, not the drum bubble, aging resistance, bright color, the asphalt based on the pavement is the best.


Changzhou Jintan Brother Sports Products Co., Ltd

General manager:  Yongzhong Fan 86-13906149750

Marketing Director:  Yijun Pan 86-13813512809

Phone: 86-519-82529238

Email: sales@jtbrothersports.com

Add: No.12 huifu road Economic Development Zone Jintan City, Jiangsu, China P.C.: 213200

CONTACT US

Contact: Yijun Pan

Phone: 86-13813512809

Tel: 86-519-82529238

Email: sales@jtbrothersports.com

Add: No.12 huifu road Economic Development Zone Jintan City, Jiangsu, China P.C.: 213200

Scan the qr codeClose
the qr code